Prodaksha Developers

Value chains › Building Materials

Building materials (concrete blocks and pavers)

Dry mixes by % weight of cement, quarry dust and 6 mm ballast; blocks and pavers pressed on moulds counted in cycles; fresh stock goes to the curing yard (quarantine) and is released only after the curing days and a compressive-strength test; sold by the piece, the pallet or the m².

mfg.building_materials Formulation and mixing example yields, to be confirmed at the factory

What the factory receives

Raw material your system can send as a consignment (item.code):

ItemCodeUnitHS code
Cement CEM II 32.5NCEMENT-32.5kg2523.29
Cement CEM I 42.5NCEMENT-42.5kg2523.29
Quarry dustQUARRY-DUSTkg2517.49
Ballast 6 mm (1/4 inch chips)BALLAST-6MMkg2517.10
Red iron oxide pigmentPIGMENT-RED-OXIDEkg2821.10
Raw water (borehole or mains)WATER-RAWL

Units besides kg: bag50 = 50 kg bag (50 kg) , pallet60 = Pallet of 60 blocks (60 pcs) , pallet10m2 = Pallet of 10 m² pavers (10 m2)

What the factory makes

Block dry mix (mix ratio by % weight)

InCodeShare
Cement CEM II 32.5NCEMENT-32.511 %
Quarry dustQUARRY-DUST59 %
Ballast 6 mm (1/4 inch chips)BALLAST-6MM30 %
OutCodeKindYield
Block dry mix (1 : 5.4 : 2.7)DRY-MIX-BLOCKMain product97–100 %
WasteWASTEWaste0–3 %

Steps: Batching by weight → Dry mixing

Paver dry mix, red (mix ratio by % weight)

InCodeShare
Cement CEM I 42.5NCEMENT-42.518 %
Quarry dustQUARRY-DUST50 %
Ballast 6 mm (1/4 inch chips)BALLAST-6MM31.5 %
Red iron oxide pigmentPIGMENT-RED-OXIDE0.5 %
OutCodeKindYield
Paver dry mix, redDRY-MIX-PAVERMain product97–100 %
WasteWASTEWaste0–3 %

Steps: Batching by weight → Dry mixing with pigment

Hollow block 6 in (about 17 kg fresh)

InCodeShare
Block dry mix (1 : 5.4 : 2.7)DRY-MIX-BLOCK
Raw water (borehole or mains)WATER-RAW
OutCodeKindYield
Hollow concrete block 6 in (150 × 200 × 400 mm)BLOCK-6INMain product
WasteWASTEWaste

Steps: Wet mixing, pressing and vibrating (4 blocks per cycle) → Move to the curing yard, water daily

Zigzag paver 80 mm red, per m² (about 180 kg)

InCodeShare
Paver dry mix, redDRY-MIX-PAVER
Raw water (borehole or mains)WATER-RAW
OutCodeKindYield
Zigzag paver 80 mm, redPAVER-ZZ80-REDMain product
WasteWASTEWaste

Steps: Wet mixing, pressing and vibrating → Move to the curing yard, cover and water daily

Yield is the share of the input weight, as a range seen in practice. The factory records the real weights on every run.

All products and intermediates

ItemCodeUnitHS code
Block dry mix (1 : 5.4 : 2.7)DRY-MIX-BLOCKkg
Paver dry mix, redDRY-MIX-PAVERkg
Hollow concrete block 6 in (150 × 200 × 400 mm)BLOCK-6INpcs6810.11
Zigzag paver 80 mm, redPAVER-ZZ80-REDm26810.19

Quality checks

Aggregate and cement intake intake

Every lorry of aggregate; cement per delivery

ParameterAccepted
Silt and clay content (aggregates)≤ 8 %critical: a failure holds the lot
Grading and cleanliness (no soil, organic matter)pass / failcritical: a failure holds the lot
Cement bags: KEBS mark, not older than 3 months, not lumpypass / failcritical: a failure holds the lot
Weighbridge net weight against the delivery notemeasured

Block release after curing release

Crush 3 blocks per production day at 7 and 28 days; lot stays in the curing yard until released

ParameterAccepted
Days cured before release≥ 7 dayscritical: a failure holds the lot
Compressive strength at 7 days (gross area)≥ 2.5 N/mm2critical: a failure holds the lot
Compressive strength at 28 days (gross area)≥ 3.5 N/mm2
Dimensions within ±3 mm, square edges, no crackspass / failcritical: a failure holds the lot
Water absorption≤ 12 %

Paver release after curing release

Test 4 pavers per production day at 14 and 28 days; lot stays in the curing yard until released

ParameterAccepted
Days cured before release≥ 14 dayscritical: a failure holds the lot
Compressive strength (corrected)≥ 40 N/mm2critical: a failure holds the lot
Water absorption≤ 6 %
Thickness 80 mm ±3 mm, colour evenpass / failcritical: a failure holds the lot

Results travel in run.completed (quality) and a hold in lot.hold_changed.

Example messages

1. You send a consignment

POST /api/v1/consignments. Here as toll work (the sender keeps ownership and pays for processing); leave out mode to sell the goods to the factory.

{
    "reference_no": "VAB-26-7",
    "source": "society_api",
    "kind": "value_addition",
    "mode": "toll",
    "sender": {
        "external_system": "your-system",
        "society_id": 39,
        "name": "Example Supplier Ltd"
    },
    "item": {
        "code": "QUARRY-DUST"
    },
    "declared_qty": 1000,
    "unit": "kg",
    "dispatched_at": "2026-11-15T08:10:00+03:00",
    "lots": [
        {
            "lot_no": "LOT-001",
            "qty": 1000
        }
    ]
}

2. You receive the results

Webhook run.completed, for 1,000 kg in (the middle of each yield range). Main products and co-products carry their grade when the item is one of a graded family; quality carries the checks recorded on the run.

{
    "type": "run.completed",
    "data": {
        "reference_no": "VAB-26-7",
        "work_order_ref": "WO-26-0042",
        "item": "DRY-MIX-BLOCK",
        "completed_at": "2026-11-16T17:30:00+03:00",
        "outturn_no": "LOT-…",
        "yield_pct": 98.5,
        "outputs": [
            {
                "item": "DRY-MIX-BLOCK",
                "grade": "BLOCK",
                "role": "main",
                "qty": 985,
                "unit": "kg",
                "lot_no": "LOT-…",
                "yield_flag": null,
                "bags": null,
                "bag_unit": null,
                "packets": null
            },
            {
                "item": "WASTE",
                "grade": null,
                "role": "waste",
                "qty": 15,
                "unit": "kg",
                "lot_no": "LOT-…",
                "yield_flag": null,
                "bags": null,
                "bag_unit": null,
                "packets": null
            }
        ],
        "quality": []
    }
}

Before and after the run you also receive consignment.received (weighed in), and then statement.issued, sale.proceeds or invoice.issued and payment.recorded. See Connecting a supplier or society system.